Leave a Message

By providing your contact information to Allan & Murphy Luxury Property Group, your personal information will be processed in accordance with Allan & Murphy Luxury Property Group's Privacy Policy. By checking the box(es) below, you expressly consent to receive marketing or promotional real estate communication from Allan & Murphy Luxury Property Group in the manner selected by you. For SMS text messages, message frequency varies. Message and data rates may apply. Consent is not a condition of purchase of any goods or services. You may opt out of receiving further communications from Allan & Murphy Luxury Property Group at any time. To opt out of receiving SMS text messages, reply STOP to unsubscribe. SMS text messaging is subject to our Terms of Use.

Thank you for your message. We will be in touch with you shortly.

A warm plaster and stone residence overlooks a limestone pool terrace with bronze-framed glass doors, a teak lounge, and sculptural desert planting.

Geronimo Golf Course Restoration at Desert Mountain: What Changed

October 15, 2026

Geronimo Golf Course reopened in late September after a year of restoration. Desert Mountain Club describes the course's character as intact and its foundation as renewed. Geronimo is also the middle step in a sequence. In a September 2026 submission, the Club says that since 2024 it has finished restoring Cochise, advanced the work on Geronimo and begun restoring Chiricahua. All three projects follow Jack Nicklaus' original designs and add modern, drought-resistant turf, new irrigation and updated agronomic practices. The course members are playing again this month shows the method the Club is applying across the Mountain, and it gives a fair idea of how Chiricahua will play when its turn ends.

The Year Went Mostly Underground

According to the Club's restoration feature, the project was "driven by what Members couldn't always see." Aging irrigation lines, a tired pump station, worn grasses and bunker sand needing replacement were hurting playing conditions. The architecture itself still deserved to be kept.

So most of the year went into infrastructure. A new pump station and HDPE irrigation piping replaced the old equipment and PVC pipe. A single-head irrigation system now allows precise, isolated watering, helped by better sprinkler spacing and upgraded nozzles. It runs on software that Director of Agronomy Todd Bohn can operate remotely, even from his smartwatch. Bohn led the project with Chad Goetz of Nicklaus Design. Before Desert Mountain, Bohn oversaw agronomy at five courses at Big Cedar Lodge, according to Golf Course Industry's 2021 report on his hiring.

Geronimo has carried a heavy load for a long time. It opened on October 31, 1989, as Desert Mountain's third Jack Nicklaus Signature design. Nicklaus, Jim Carter and a 19-year-old Phil Mickelson played the first round, and none of them broke par. Carter shot 73, and Nicklaus and Mickelson each posted 74. In its early years the course played at more than 7,400 yards with a 77.1 course rating. Nicklaus first pictured it as the Club's tournament course, but Cochise's more spectator-friendly terrain won the role, and Cochise hosted The Tradition from 1989 to 2001. Geronimo's par-3 18th had a part in history before the course even opened, hosting the playoff for the 1988 Desert Scramble, which Greg Norman won with a birdie putt. The hole was later included in the 2000 book The World's 500 Greatest Golf Holes.

What Changed Where You Will See It

The visible changes are small and are aimed at specific trouble spots. Per the Club, here is what changed:

  • Turf. Geronimo was re-grassed with the same turf varieties used at Cochise, chosen for better color, durability, consistency and playing characteristics.
  • Tees. Teeing areas were enlarged, especially on the par 3s, to create more space.
  • Views. Careful pruning restored sight lines that had been lost for years, bringing back views closer to the ones Nicklaus introduced in 1989.
  • The ninth hole. A low area 50 to 75 yards short of the green kept collecting water, silt and debris. Crews installed two 12-inch underground pipes and an upstream sediment collection area to catch that material before it reaches the playing surface.
  • Bunkers, trees and rock. Some fairway bunkers moved closer to greens. Trees blocking views and routes to the green were relocated. Fairways were widened, and rocks and boulders were removed or buried to improve play and steer water away from vulnerable fairway.
  • Comfort stations. The stations at the sixth tee and beside the 13th green and 14th tee were rebuilt at ground level, so there are no stairs to climb.

The official Geronimo course page lists 18 holes, par 72 and 7,293 yards. It names holes 1, 6, 11 and 18 as signature holes and describes the finish as a long par-3 tee shot to a sloping green beside the clubhouse. That page was published before the reopening, so the scorecard yardage may change once the expanded tees are measured. The Club also posted a flyover of all 18 holes with the restoration feature, which is the quickest way to see the new sight lines before a first round back.

Cochise Set the Template

Most of what happened at Geronimo had already been tried next door. Cochise's restoration started from the same problem. By the Club's account, its 35-year-old irrigation, pump station and bunker drainage were failing. The plan was developed by Goetz, the Club's Golf & Agronomy Committee, Bohn and PGA Director of Golf John Lyberger. The work there included modern irrigation, re-grassed greens, new bunker liners and a sand blend of 75 percent white to 25 percent tan. Crews also expanded tees, most noticeably at holes 1 and 13, and laser-scanned the greens to bring them back to their original dimensions within a tenth of an inch.

Outside reviewers took note. Sports Illustrated named Cochise the Best Modern Private Course Restoration in its 2024 awards. It identified Tahoma 31 as the new fairway grass and reported that the greens had been rebuilt and re-turfed to their original specifications.

Seen together, the two projects show the pattern:

Cochise Geronimo
Status Restoration completed, open since 2024 Reopened late September 2026
Core problem Aging irrigation, pump station and bunker drainage Aging irrigation, pump station, worn grass and bunker sand
Turf Tahoma 31 fairways, per Sports Illustrated Re-grassed with the same varieties used at Cochise
Tees Expanded, especially holes 1 and 13 Expanded, especially the par 3s
Design lead Chad Goetz, Nicklaus Design Chad Goetz, Nicklaus Design
Recognition SI's 2024 Best Modern Private Course Restoration Club feature published September 30, 2026

The same architect, the same agronomy lead and the same turf mean the two courses that share a clubhouse now share a playing surface too. That makes Chiricahua, already under restoration, the next course likely to follow the same approach.

The Fall Rotation Shows the Handoff

The Arizona Golf Association's 2026 overseed schedule shows how the work moves across the Mountain. Desert Mountain's courses report their own dates to the AGA, and those dates can change, so treat them as scheduled rather than confirmed. Here is Desert Mountain's listing as of early October:

Course Overseeding Listed closure Listed reopening
No. 7 Yes 9/14/2026 9/27/2026
Cochise Yes 9/28/2026 10/11/2026
Outlaw Yes 9/28/2026 10/18/2026
Apache Yes 10/12/2026 10/25/2026
Geronimo No Listed as closed 9/28/2026
Renegade No Listed as closed 9/28/2026
Chiricahua No Listed as closed Listed as closed

Geronimo's listed reopening date of September 28 is the same day Cochise and Outlaw closed for overseeding, so the restored course came back just as two others went out. As of October 7, No. 7's window has ended, Cochise is listed to reopen October 11, Apache is listed to close October 12, and Outlaw is listed to return October 18. Chiricahua has no reopening date in either column, which fits the Club's statement that its restoration has begun.

The Building Around the Cochise and Geronimo Clubhouse

The course restorations are only part of the investment. The same September 2026 Club submission says members overwhelmingly approved the first phase of a Long-Range Facilities Plan. Much of that phase is centered on the Cochise and Geronimo side of the Mountain.

  1. A two-story Range House is under construction. The Club says it will add amenities, dining and gathering space overlooking the Cochise and Geronimo practice facilities.
  2. More parking is planned at the Cochise/Geronimo Clubhouse to make arrival easier.
  3. The Outlaw Clubhouse is being reimagined as a place for dining, celebrations and member events.
  4. The bocce complex at Seven Clubhouse is being expanded for what the Club calls one of its fastest-growing recreational programs.

The Club has not published completion dates for these projects, and none are offered here. The direction is clear, though. Two Nicklaus courses now restored on the same template, a practice area getting a new building between them, and a third course in restoration all point to steady, planned reinvestment in the parts of Desert Mountain that are more than 30 years old.

If you own on the Mountain and want to talk through how the Geronimo and Chiricahua restorations, or the Long-Range Facilities Plan, factor into a future sale or purchase, Allan & Murphy Luxury Property Group follows Desert Mountain's club projects closely and is glad to talk it through with you.

Work With Us

Our team brings deep Scottsdale expertise, honest guidance, and a genuine investment in every client outcome. We are not just here to close deals — we are here to help you make one of the biggest decisions of your life with confidence.